The fifth level of the library will be inaccessible to users. Study rooms will not be available during this phase. If materials are needed from the fifth floor, users may submit a request that library staff will fill once a day.
The north half of the third level, including the classroom, spiral staircase, and computer lab will be inaccessible to users.
Portions of level two will also be under construction but should not impact user space.
The north half of level four will be inaccessible due to the removal of the spiral staircase. Once the staircase is removed, the entire floor will be accessible to students.
The fifth level will reopen. Library staff will relocate to the fifth floor. Portions of the floor may be accessible to students but study rooms will no longer be on the fifth floor. The classroom will reopen on the fifth level.
The north half of the third level will reopen with a new library service desk, open study space, and an entrance facing the quad. The south half of the third level will be inaccessible to students as it undergoes renovation.
Level four will fully reopen to students.
Level two will fully reopen to students.
University Libraries will be fully accessible with art and rare book galleries, a new computer lab, 18 accessible study rooms, 4 gender neutral bathrooms, a lactation room, open study spaces, and more.