Currently, the library is preparing the building for renovation.
On Level 5:
- Library staff shifted journals and books, in addition to taking down shelving that will not be used in the renovation.
- Moved the juvenile and curriculum collections to Level 2
- Cleared and closed all study rooms.
- Removed and stored open study tables and chairs.
- Removed all open computers from floor.
On Level 3:
- Library staff worked to downsize the reference collection and moved the reference collection to Level two.
- Reference shelving removed.
On Level 2:
- Library staff prepared workspace to become the new art gallery.
- Now home to the reference and juvenile collections